We offer a turnkey package for all of our customers, starting from an initial site survey to the commissioning of both UPS and Power Generators. This process involves using highly qualified and experienced engineers who both Install, Project Manage and Commission the job as well as regularly offering training to customers as part of the package, to ensure that you get the most out of your UPS and Generator system.

We take UPS maintenance very seriously at IML as we believe a company is judged more on their post sales customer support than at any other point in the sales process. On all UPS Maintenance (and general maintenance contracts) we give you a 24/7 technical helpline number should any problems arise.

Check out our headline offers for UPS installation and maintenance:

SP-IMLTECH-5-6
£595

Basic Installation of 5-6KVA UPS
The following are assumed for a none site surveyed quote:
SP-IMLTECH-8-10
£735

Basic Installation of 8-10KVA UPS
The following are assumed for a none site surveyed quote:
  • The UPS is within 3m of the 32A incoming supply
  • No access through walls or underfloor is required
  • Live Power is available on site and a 32A
    commando is presented in the room
  • Engineers to deliver and install UPS in to position
  • UPS to be supplied with 3m of Cable and 32A commando
  • Removal and disposal of existing UPS equipment
  • Normal Working Hours
  • UK Mainland Only
  • Any additional work will be chargeable
  • The UPS is within 3m of the 63A incoming supply
  • No access through walls or underfloor is required
  • Live Power is available on site and a 63A
    commando is presented in the room
  • Engineers to deliver and install UPS in to position
  • UPS to be supplied with 3m of Cable and 63A commando
  • Removal and disposal of existing UPS equipment
  • Normal Working Hours
  • UK Mainland Only
  • Any additional work will be chargeable


5-10kVA Next Business Day Response

5-10kVA) 8hr Response

5-10kVA) 4hr Response
• SLA Response Time - NBD
• One Maintenance Visit per Annum
• Call-outs - Included
• 24 Hour Technical Helpline

Note: UPS Parts Covered By APC In The First 3 Years

• SLA Response Time - 8 Hours
• One Maintenance Visit per Annum
• Call-outs - Included
• 24 Hour Technical Helpline

Note: UPS Parts Covered By APC In The First 3 Years

• SLA Response Time - 4 Hours
• One Maintenance Visit per Annum
• Call-outs - Included
• 24 Hour Technical Helpline

Note: UPS Parts Covered By APC In The First 3 Years